We have a road! lol, it sounds silly but I dont think ive ever been this exited about the smell of tar!
Our 2nd lot of working drawings have been signed and sent off for developer aproval and energy rating. so hopefully we will be signing contracts in a couple of weeks. xxxxx fingers crossed.xxxxxx
I am really happy with the admin side of things, Ive heard that burbank is slow through admin, but, in our case it has been steady and productive.
Wednesday, 29 February 2012
Tuesday, 14 February 2012
color appointment......on a budget
How exiting! color appointment today. I was concerned from what I have read online that my cat1 and cat2 choices would be limited and Id walk out dissapointed, but this was not the case! we stuck to our budget and got everything we loved, of course there would have been lots more to choose from if we had money to burn. But over all a fantastic experience and a great out come. The girls at Burbank are happy knowledgable and helpful, I wish I could get service with people like that everyday!
so heres our choices-
Exterior colors:
BRICKS: boral mist cat6
FEATURE BRICKS: boral domino cat7
MORTAR: natural
CLADDING: surfmist
ROOF: bristile sanctuary cat1
GUTTER/FASCIA: monument
DOWNPIPES: surfmist
GARAGE: slimline surfmist
WINDOWS: pearlwhite gloss
ENTRY DOOR: windsor clear glazed w/ satin black stain
EAVES: white
CONCRETE: black
Total: $2420
I know everyone may think its a bit over the top to spend money upgrading bricks etc. but I judge a house by what it looks like from the street, so for us, we spent the bulk of our budget on the front of the house.
Interior colors:
CEILINGS: burbank white (upgrade)
WALLS: colonial
CARPET: aged driftwood cat1
BLINDS: holland pumice
WALL TILES:
kitchen, bathroom ensuite laundry all cat1 white gloss 300x200 horizontal stack
KITCHEN SPLASHBACK: antartica
(unfortunatley they wanted an extra $900 to extend the splash across the wall
so we had to opt for white tiles next to the splash.)
FLOOR TILES:
chicago gunmetal 400x400 cat1 (they look darker in the photo, theyre a light grey)
BATHROOM and ENSUITE VANITY:
white lace cat1 benches and pewter oak cat2 cabinets
LAUNDRY CABINET:
white lace benches and astral bitumen cat1
KITCHEN CABINETS:
urban bamboo cat2
STONE BENCHTOPS: polar
Total: $550
The other things we included at a cost were-
privacy locks to wc and ensuite $50
Translucent windows to bathroom, ensuite and wc $660!!! I couldnt skimp on this as I am paranoid someone is watching me on the loo or in the tub. lol.
we also upgraded our fibre optic package which was an extra $1000.
So my tip to anyone going to their color appointment- if you cant afford to upgrade something dont look at the choices, we didnt look at anything else exept the standard appliances tapwear etc so we wernt tempted to spend $$$$$$$.
It took us 2 and a half hours to get through color selections and electrical and we did our homework on colors etc before we went in.
so heres our choices-
Exterior colors:
BRICKS: boral mist cat6
FEATURE BRICKS: boral domino cat7
MORTAR: natural
CLADDING: surfmist
ROOF: bristile sanctuary cat1
GUTTER/FASCIA: monument
DOWNPIPES: surfmist
GARAGE: slimline surfmist
WINDOWS: pearlwhite gloss
ENTRY DOOR: windsor clear glazed w/ satin black stain
EAVES: white
CONCRETE: black
Total: $2420
I know everyone may think its a bit over the top to spend money upgrading bricks etc. but I judge a house by what it looks like from the street, so for us, we spent the bulk of our budget on the front of the house.
Interior colors:
CEILINGS: burbank white (upgrade)
WALLS: colonial
CARPET: aged driftwood cat1
BLINDS: holland pumice
(sorry bout the happy snap but in the left bottom corner is the white gloss tile and its a better picture of the floor tile.)
WALL TILES:
kitchen, bathroom ensuite laundry all cat1 white gloss 300x200 horizontal stack
KITCHEN SPLASHBACK: antartica
(unfortunatley they wanted an extra $900 to extend the splash across the wall
so we had to opt for white tiles next to the splash.)
FLOOR TILES:
chicago gunmetal 400x400 cat1 (they look darker in the photo, theyre a light grey)
BATHROOM and ENSUITE VANITY:
white lace cat1 benches and pewter oak cat2 cabinets
LAUNDRY CABINET:
white lace benches and astral bitumen cat1
KITCHEN CABINETS:
urban bamboo cat2
STONE BENCHTOPS: polar
Total: $550
The other things we included at a cost were-
privacy locks to wc and ensuite $50
Translucent windows to bathroom, ensuite and wc $660!!! I couldnt skimp on this as I am paranoid someone is watching me on the loo or in the tub. lol.
we also upgraded our fibre optic package which was an extra $1000.
So my tip to anyone going to their color appointment- if you cant afford to upgrade something dont look at the choices, we didnt look at anything else exept the standard appliances tapwear etc so we wernt tempted to spend $$$$$$$.
It took us 2 and a half hours to get through color selections and electrical and we did our homework on colors etc before we went in.
Wednesday, 8 February 2012
Its all a waiting game.
its starting to take a toll on my sanity, all this waiting is driving me to stalk everyones houses in the Geelong area. Ive been driving around our estate everyday to see if theres any progress!My husband recived a phone call from edge last night, they wanted us to go in
next week to choose our colors!
Then my darling told me he said NO!
Im going to spend my day on the phone frantically trying to get our time next week back.
wish me luck!.................
yay!!!!!! We have our color appointment booked in for next Wednesday! 15/02/2012.
Then my darling told me he said NO!
Im going to spend my day on the phone frantically trying to get our time next week back.
wish me luck!.................
yay!!!!!! We have our color appointment booked in for next Wednesday! 15/02/2012.
Tuesday, 17 January 2012
our house design
after lots of disscussion and 3 different builders we decided on Burbank's SOHO2400. Its double frontage suited our 18.65m block width.
we made only a few changes to the original plan. A walk in pantry for me and roller door and window at the rear of the garage to keep hubby happy!
we made only a few changes to the original plan. A walk in pantry for me and roller door and window at the rear of the garage to keep hubby happy!
our block
we found our block at the start of 2011 in Estuary Leopold. It is the perfect spot for us to raise our young family. Close to schools, shops, parks and recreational reserves. We put our deposit down 2 weeks later,a little bit impulsive as we already have a great house but we just couldnt help ourselves!
Land was supposed to be titled in deacember 2011, but as it usually goes there have been some delays and now were looking at settlement in March.
we have gutters! 17/01/2012. hubbys worried cause we dont have a crossover like everyone else!
Land was supposed to be titled in deacember 2011, but as it usually goes there have been some delays and now were looking at settlement in March.
we have gutters! 17/01/2012. hubbys worried cause we dont have a crossover like everyone else!
hes measuring to see where its supposed to be?
our block takes up most of our side of the street
today 8/2/2012 we finally heard back from our land developer.Our crossover will be put in before title, so no more delays for us. Footpaths went in last week shouldnt be too long now before the roads get done. xxxxxxxx crossing my fingers.xxxxxxxxxxxx
just some more boring photos of our block
and some more.......
unfortunetly for us the parkland beside our block has been bordered with an ugly footpath, so my dream of having our study and bedroom overlooking the park will now have a view of walkers by.
I guess that what you get when you by land thats not developed yet.
Subscribe to:
Posts (Atom)













